| 1 |
JURU GAMBAR BANGUNAN GEDUNG |
7
|
| 2 |
AHLI TEKNIK BANGUNAN GEDUNG |
28
|
| 3 |
JURU GAMBAR PEKERJAAN JALAN DAN JEMBATAN |
7
|
| 4 |
PELAKSANA LAPANGAN PEKERJAAN JALAN |
8
|
| 5 |
PELAKSANA LAPANGAN PERKERASAN JALAN BETON |
10
|
| 6 |
AHLI PEMELIHARAAN JALAN DAN JEMBATAN |
6
|
| 7 |
AHLI PELAKSANAAN PEMBONGKARAN BANGUNAN |
6
|
| 8 |
AHLI PERAWATAN BANGUNAN GEDUNG |
8
|
| 9 |
MANAJER PENGELOLAAN BANGUNAN GEDUNG |
10
|
| 10 |
AHLI PENILAI KELAIKAN BANGUNAN GEDUNG (ASPEK ARSITEKTUR DAN TATA RUANG LUAR) |
11
|
| 11 |
MANAJER PELAKSANAAN PEKERJAAN JALAN/ JEMBATAN |
8
|
| 12 |
PELAKSANA PEMELIHARAAN JEMBATAN |
9
|
| 13 |
AHLI GEOTEKNIK |
21
|
| 14 |
TEKNISI GEOTEKNIK |
6
|
| 15 |
AHLI MUDA PERENCANA PONDASI |
8
|
| 16 |
PENGAWAS LAPANGAN PEKERJAAN DRAINASE PERKOTAAN |
7
|
| 17 |
PELAKSANA LAPANGAN PEKERJAAN DRAINASE PERKOTAAN |
7
|
| 18 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG |
7
|
| 19 |
AHLI MUDA TEKNIK JALAN |
22
|
| 20 |
PELAKSANA PEMELIHARAAN JALAN |
13
|
| 21 |
AHLI MUDA TEKNIK BANGUNAN GEDUNG |
15
|
| 22 |
AHLI MADYA TEKNIK BANGUNAN GEDUNG |
22
|
| 23 |
AHLI MUDA PERAWATAN BANGUNAN GEDUNG |
6
|
| 24 |
AHLI MADYA PERAWATAN BANGUNAN GEDUNG |
7
|
| 25 |
JURU GAMBAR BANGUNAN GEDUNG LEVEL 2 |
5
|
| 26 |
JURU GAMBAR BANGUNAN GEDUNG LEVEL 3 |
6
|
| 27 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG LEVEL 2 |
5
|
| 28 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG LEVEL 3 |
6
|
| 29 |
AHLI MADYA TEKNIK JALAN |
27
|
| 30 |
AHLI UTAMA TEKNIK JALAN |
29
|
| 31 |
AHLI MUDA PEMELIHARAAN JALAN DAN JEMBATAN |
4
|
| 32 |
AHLI MADYA PEMELIHARAAN JALAN DAN JEMBATAN |
5
|
| 33 |
PELAKSANA LAPANGAN PEKERJAAN JALAN LEVEL 2 |
6
|
| 34 |
PELAKSANA LAPANGAN PEKERJAAN JALAN LEVEL 3 |
7
|
| 35 |
JURU GAMBAR PEKERJAAN JALAN DAN JEMBATAN LEVEL 2 |
5
|
| 36 |
JURU GAMBAR PEKERJAAN JALAN DAN JEMBATAN LEVEL 3 |
6
|
| 37 |
AHLI MUDA GEOTEKNIK |
8
|
| 38 |
AHLI MADYA GEOTEKNIK |
14
|
| 39 |
AHLI MADYA PERENCANA PONDASI |
9
|
| 40 |
AHLI UTAMA PERENCANA PONDASI |
9
|
| 41 |
AHLI MUDA PELAKSANAAN PEMBONGKARAN BANGUNAN |
4
|
| 42 |
AHLI MADYA PELAKSANAAN PEMBONGKARAN BANGUNAN |
5
|
| 43 |
AHLI MADYA REKAYASA KONSTRUKSI BANGUNAN GEDUNG |
8
|
| 44 |
Ahli Rekayasa Konstruksi Bangunan Gedung |
9
|
| 45 |
AHLI PEMERIKSA KELAIKAN FUNGSI STRUKTUR BANGUNAN GEDUNG |
14
|
| 46 |
AHLI PENILAI BANGUNAN HIJAU |
14
|
| 47 |
MANAJER LAPANGAN PELAKSANAAN PEKERJAAN GEDUNG |
6
|
| 48 |
PENGAWAS PEKERJAAN STRUKTUR BANGUNAN GEDUNG UTAMA |
9
|
| 49 |
PENGAWAS PEKERJAAN STRUKTUR BANGUNAN GEDUNG MADYA |
9
|
| 50 |
TUKANG CAT BANGUNAN GEDUNG |
8
|
| 51 |
TUKANG PLESTER BANGUNAN GEDUNG |
5
|
| 52 |
TUKANG PASANG UBIN |
5
|
| 53 |
TUKANG PASANG BATA |
7
|
| 54 |
TUKANG KAYU KONSTRUKSI |
13
|
| 55 |
TUKANG BESI BETON |
5
|
| 56 |
MANDOR TUKANG PASANG BETON PRECAST |
8
|
| 57 |
PEMASANG PERANCAH DAN ACUAN/CETAKAN BETON |
6
|
| 58 |
TUKANG BANGUNAN GEDUNG |
13
|
| 59 |
TUKANG PASANG RANGKA ATAP BAJA RINGAN |
3
|
| 60 |
TUKANG PASANG / APLIKATOR / INSTALATUR RANGKA BAJA RINGAN |
4
|
| 61 |
TUKANG PASANG WATER PROOFING |
7
|
| 62 |
MANDOR PEMASANGAN (INSTALLER) RANGKA ATAP BAJA RINGAN |
5
|
| 63 |
Mandor Pemasangan Rangka Dinding dan Lantai Baja Ringan |
6
|
| 64 |
MANAJER PRODUKSI CAMPURAN ASPAL PANAS (ASPHALT MIXING PLANT MANAGER) |
8
|
| 65 |
TEKNISI LABORATORIUM BETON ASPAL |
10
|
| 66 |
PELAKSANA PRODUKSI CAMPURAN ASPAL PANAS |
6
|
| 67 |
AHLI MUDA KESELAMATAN JALAN |
6
|
| 68 |
AHLI MADYA KESELAMATAN JALAN |
7
|
| 69 |
AHLI KESELAMATAN JALAN |
8
|
| 70 |
MANDOR PERKERASAN JALAN |
8
|
| 71 |
AHLI MUDA TEKNIK JEMBATAN |
10
|
| 72 |
AHLI MADYA TEKNIK JEMBATAN |
11
|
| 73 |
AHLI UTAMA TEKNIK JEMBATAN |
12
|
| 74 |
AHLI MUDA REHABILITASI JEMBATAN |
6
|
| 75 |
AHLI MADYA REHABILITASI JEMBATAN |
7
|
| 76 |
AHLI REHABILITASI JEMBATAN |
8
|
| 77 |
PELAKSANA LAPANGAN PEKERJAAN PEMASANGAN JEMBATAN RANGKA BAJA STANDAR |
6
|
| 78 |
TEKNISI JEMBATAN RANGKA BAJA |
7
|
| 79 |
PELAKSANA OPERASI DAN PEMELIHARAAN BENDUNGAN TIPE URUKAN |
8
|
| 80 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI |
10
|
| 81 |
PELAKSANA PEMASANGAN PINTU AIR |
6
|
| 82 |
PELAKSANA PEKERJAAN PEMELIHARAAN JARINGAN IRIGASI |
6
|
| 83 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI LEVEL 2 |
8
|
| 84 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI LEVEL 3 |
9
|
| 85 |
AHLI MUDA BIDANG KEAHLIAN TEKNIK SUMBER DAYA AIR |
28
|
| 86 |
AHLI MADYA BIDANG KEAHLIAN TEKNIK SUMBER DAYA AIR |
31
|
| 87 |
AHLI UTAMA BIDANG KEAHLIAN TEKNIK SUMBER DAYA AIR |
32
|
| 88 |
MANAJER PELAKSANA KONSTRUKSI SISTEM PRODUKSI AIR MINUM (SPAM) |
7
|
| 89 |
AHLI MUDA PENGUKURAN JALAN |
9
|
| 90 |
JURU UKUR (SURVEYOR) LEVEL 2 |
7
|
| 91 |
JURU UKUR (SURVEYOR) |
8
|
| 92 |
PELAKSANA LAPANGAN PEKERJAAN GROUTING |
9
|
| 93 |
PELAKSANA LAPANGAN PERKERASAN JALAN BETON MADYA |
9
|
| 94 |
PELAKSANA PEMELIHARAAN JALAN MADYA |
11
|
| 95 |
TEKNISI JEMBATAN RANGKA BAJA MADYA |
7
|
| 96 |
TEKNISI JEMBATAN RANGKA BAJA UTAMA |
7
|
| 97 |
PELAKSANA PEMELIHARAAN JEMBATAN MADYA |
8
|
| 98 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN PENGAMAN PANTAI MADYA |
5
|
| 99 |
Pelaksana Lapangan Pekerjaan Bronjong Level 3 |
7
|
| 100 |
PELAKSANA LAPANGAN PEKERJAAN BRONJONG |
7
|
| 101 |
Pengawas Lapangan Pekerjaan Drainase Perkotaan Madya |
6
|
| 102 |
SURVEYOR TERESTRIS |
10
|
| 103 |
SURVEYOR REKAYASA |
10
|
| 104 |
TEKNISI SURVEI TERESTRIS |
7
|
| 105 |
Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai |
6
|
| 106 |
TEKNISI LABORATORIUM BETON ASPAL MADYA |
10
|
| 107 |
TEKNISI LABORATORIUM BETON ASPAL UTAMA |
10
|
| 108 |
Pelaksana Lapangan Pekerjaan Pembangunan Jalan Rel Madya |
8
|
| 109 |
PELAKSANA LAPANGAN PEKERJAAN PEMASANGAN JEMBATAN RANGKA BAJA STANDAR MADYA |
5
|
| 110 |
PELAKSANA OPERASI DAN PEMELIHARAAN BENDUNGAN TIPE URUKAN UTAMA |
8
|
| 111 |
PELAKSANA PEMASANGAN PINTU AIR MADYA |
5
|
| 112 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI MADYA |
9
|
| 113 |
Pelaksana Lapangan Pekerjaan Bangunan Air Limbah Permukiman (setempat dan terpusat) Madya |
6
|
| 114 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN AIR LIMBAH PERMUKIMAN (SETEMPAT DAN TERPUSAT) |
6
|
| 115 |
PELAKSANA LAPANGAN PEKERJAAN LAPISAN KEDAP AIR DI TEMPAT PEMROSESAN AKHIR (TPA) MADYA |
5
|
| 116 |
PELAKSANA LAPANGAN PEKERJAAN LAPISAN KEDAP AIR DI TEMPAT PEMROSESAN AKHIR (TPA) |
5
|
| 117 |
PELAKSANA LAPANGAN PEKERJAAN JALAN MADYA |
8
|
| 118 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG MADYA |
7
|